top of page

Our Work

Explore Our Latest Work in Industrial, Commercial & Cryogenic Insulation

BENNET DAM.jpg

COOLING UPGRADE SYSTEM 

BC HYDRO                            W.A.C. BENNETT DAM

This project involved the installation of insulation on approximately 3,500 linear feet of upgraded chilled water supply and return piping servicing all 10 turbines, located within the underground structure of the dam. The scope included the application of high-performance insulation systems finished with durable PVC jacketing to ensure long-term protection and efficiency in a demanding environment.

Executed in a complex and confined setting, the project was completed with a strong focus on coordination, quality control, and safety. The result was a fully approved installation with zero incidents, demonstrating our team’s ability to deliver high-standard work in critical infrastructure conditions.

HVAC UPGRADE

BDH 

We provided insulation for both duct systems and piping, incorporating high-quality aluminum jacketing to ensure a fully waterproof and durable finish. This system was designed to protect against environmental exposure while maintaining optimal thermal performance.

The project was executed within a tight schedule, delivering efficient results without compromising quality. Completed with zero incidents, the work reflects our commitment to safety, precision, and high-performance standards across every phase of execution.

shared image (9).jpg
Media (4) (1).jpg

HVAC UPGRADE 

CT SCANNER - KBRH

We provided insulation for duct systems, finished with durable aluminum jacketing to ensure a fully waterproof and long-lasting installation. The system was designed to perform reliably under demanding conditions while protecting against environmental exposure.

Despite operating in a highly congested work area, our team executed the project efficiently and within a tight timeline. The work was completed with zero incidents and to a high standard of quality, demonstrating our ability to deliver safe and precise results in complex environments.

VENTILATION SYSTEM 

ROSSLAND 

We installed insulation on an exposed ventilation system, incorporating heat trace to protect against moisture and water intrusion in a harsh operating environment. The system was designed to maintain performance and prevent condensation under challenging conditions.

The project was completed within a compressed schedule, delivering high-quality results with zero incidents. This work highlights our ability to execute efficiently while maintaining strict safety and performance standards in demanding environments.

Media (63).jpg
bottom of page